BDR 0.00% 6.5¢ beadell resources limited

Ann: Positive Urucum Underground Pre-Feasibility Study, page-17

  1. 33,567 Posts.
    lightbulb Created with Sketch. 1762
    "How do you go UG for 18 mil ?? I suspect that this figure even the LOM 7-8 Years Cap ex of 34 mil is very low"

    The plan shows they are using the pit road instead of having to put in a box cut to get down to the portal , so say 75 meters depth * $6000 a m * 8/1 grade = say a saving of $3.6M in drive cost or guessing $2 M if a box cut had been put in .

    250 metres vertical depth to the high grade ore 250 * $6000 * 8 grade = $12M
    $12M + $3.6M = $16M

    just guesstimates of course
 
watchlist Created with Sketch. Add BDR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.