ANO 2.68% 76.5¢ advance zinctek limited

Ann: Powder Production at Capacity to August 2019, page-9

  1. 459 Posts.
    lightbulb Created with Sketch. 43
    a further 50% increase to the current 1500MT or a further 50% increase to the previously announced target of 2200MT?

    As it's a reference to physical equipment, my assumption is it's a 50% increase on current equipment. And 1.5*1500 MT = 2250 MT, so it may be the physical realization of the previous announcement.
 
watchlist Created with Sketch. Add ANO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.