..... "Power has over 3,000 metres of drill holes that have just sat around waiting for sufficient funds so they can fully assayed them. "
No need to make these kind of assumptions. SA-DEM have publicly available information that will clearly show you the methodology of some of the previous works done by PNN.
Here is a URL path to freely available PACE reports that present what was done, how it was done & data resulting from that work. [you'll have to copy/paste ... sorry cant seem to embed hyperlink]
https://sarigbasis.pir.sa.gov.au/We...p;set=2&bclabel=<SAMREF.SARIG1>CAT7
@TP ... a soft NO to all three questions. My holdings sentiment: PNN holds yet unrealised CGT loss for future ATO returns.
- Forums
- ASX - By Stock
- Ann: Power to Commence Exploration at Musgrave Project
..... "Power has over 3,000 metres of drill holes that have just...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PNN (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
-0.010(9.09%) |
Mkt cap ! $12.11M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 10.0¢ | $295 | 2.95K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 124055 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.0¢ | 61636 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 124055 | 0.100 |
1 | 11111 | 0.099 |
2 | 151557 | 0.090 |
1 | 30600 | 0.089 |
1 | 10000 | 0.087 |
Price($) | Vol. | No. |
---|---|---|
0.110 | 61636 | 1 |
0.115 | 115000 | 3 |
0.120 | 29534 | 3 |
0.125 | 76866 | 3 |
0.135 | 14800 | 2 |
Last trade - 11.01am 18/09/2024 (20 minute delay) ? |
Featured News
PNN (ASX) Chart |