Good progress. The equipment to construct the PCD facility has arrived in country, local fabrication and assembly of various components is well advanced at Ottoway Engineering.
Control cabinet (PLC's and electrical cabinet) work is nearing completion and the PLC programming (computer program in the old langauge) is being completed.
Gas analysis gear has arrived and is being installed in equipment cabinets.
Drilling is underway for the injection and vent holes ready for down hole casings and well heads to be installed.
Equipment is on track (slightly behind schedule?)
Still waiting for environmental approval for PCD.
Initial flaring scheduled for early 2018.
- Forums
- ASX - By Stock
- NRZ
- Ann: Pre-Commercial Demonstration Stage Update
Ann: Pre-Commercial Demonstration Stage Update, page-2
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
-0.001(12.5%) |
Mkt cap ! $7.597M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $4.4K | 1.225M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
65 | 57625502 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 8643444 | 16 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
65 | 57625502 | 0.003 |
70 | 133467303 | 0.002 |
27 | 174150000 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 8643444 | 16 |
0.005 | 6988429 | 6 |
0.006 | 1408009 | 3 |
0.007 | 1783856 | 3 |
0.008 | 137500 | 2 |
Last trade - 10.06am 15/08/2024 (20 minute delay) ? |
Featured News
NRZ (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & Managing Director
Charles Armstrong
CEO & Managing Director
SPONSORED BY The Market Online