The very first mention in the announcement was this testing cycle enables EcoGraf the appropriate information regarding sizing & selection of plant equipment.
I think this exercise was critical for the ergonomics/design work of the plant & the rest was a pleasant bonus or secondary result from this elaborate exercise.
Would have helped Engineering with plant equipment markings and space dimensions, taking consideration of how much space the forks need to turn in areas etc.
Very pleasing mate. Cheers.
- Forums
- ASX - By Stock
- EGR
- Ann: Pre-Construction Locked-Cycle Testwork Completed
Ann: Pre-Construction Locked-Cycle Testwork Completed, page-17
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EGR (ASX) to my watchlist
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $45.40M |
Open | High | Low | Value | Volume |
9.9¢ | 10.0¢ | 9.7¢ | $1.042K | 10.54K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 78000 | 9.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 19094 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 78000 | 0.096 |
2 | 29026 | 0.095 |
1 | 470 | 0.094 |
3 | 98065 | 0.090 |
1 | 120000 | 0.081 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 19094 | 2 |
0.105 | 8000 | 1 |
0.110 | 68412 | 3 |
0.115 | 27500 | 3 |
0.120 | 102079 | 2 |
Last trade - 15.34pm 15/08/2024 (20 minute delay) ? |
Featured News
EGR (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & Managing Director
Charles Armstrong
CEO & Managing Director
SPONSORED BY The Market Online