EGR 4.76% 10.0¢ ecograf limited

Ann: Pre-Construction Locked-Cycle Testwork Completed, page-20

  1. 469 Posts.
    lightbulb Created with Sketch. 341
    Hi Names

    The core purpose of locked-cycle testwork is to obtain a projection of continuous cycle (real-world commercial operation) flowsheet performance through conducting cycled lab batch tests. Certain parameters are varied under controlled conditions and the effects on overall flowsheet performance can be quantified. Effectively very detailed optimisation work geared toward commercial processing at Kwinana - final stage inputs for the engineering design.

    Most of the work conducted at the German pilot plant to date will have been simple batch tests.

    I presume the work was conducted by a commercial laboratory that offers specialised metallurgical services, such as SGS. I guess CSIRO is possible. Managed by GR such that they could obtain whatever remaining optimisation data was needed for the engineering design. Yeah, an actual processing line will have been set up.
    Last edited by Balduran: 28/05/21
 
watchlist Created with Sketch. Add EGR (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
-0.005(4.76%)
Mkt cap ! $45.40M
Open High Low Value Volume
10.5¢ 10.5¢ 9.9¢ $214.2K 2.114M

Buyers (Bids)

No. Vol. Price($)
1 50000 9.8¢
 

Sellers (Offers)

Price($) Vol. No.
10.0¢ 29999 1
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?
EGR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.