Announcements
2 March 2022 - Province Announces Positive Scoping Study
16 Aug 2022 - PV1: Completion of HyEnergy Export Project Feasibility Study
07 March 2023 - Pre-Feasibility Study Commenced for Downstream Component
(Upstream Pre-Feasibility Study Expected to be awarded soon, as per the contents of the last annoucement)
Can we infer that since Province see a need to commence two new pre-feasibility studies, that even after all this time, they don't know whether their idea is feasible?
- Forums
- ASX - By Stock
- PRL
- Ann: Pre-Feasibility Study Commenced for Downstream Component
Ann: Pre-Feasibility Study Commenced for Downstream Component, page-5
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PRL (ASX) Chart |
Day chart unavailable