Pre Feasibility studies can only occur after a positive Scoping Study
Ok sure, but the scoping study was completed over a year ago now. I guess the timeline now looks something like this:
Scoping study ✅
(take a break for a year) ✅
Pre-feasibility study - upstream
Pre-feasibility study - downstream
Feasibility study - upstream
Feasibility study - downstream
(Raise finance for FEED)
Front-end engineering design (FEED)
(Raise finance for project execution)
(Finalise contracts with hydrogen buyers)
(Final investment decision milestone)
Detail Design
Procurement
Construction
Commissioning
Start-up
- Forums
- ASX - By Stock
- PRL
- Ann: Pre-Feasibility Study Commenced for Downstream Component
Ann: Pre-Feasibility Study Commenced for Downstream Component, page-8
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PRL (ASX) Chart |
Day chart unavailable