its written in the PFS: The application of wet harvesting of the...

  1. 37,911 Posts.
    lightbulb Created with Sketch. 828
    its written in the PFS:

    The application of wet harvesting of the later stage waste salts and Potassium-bearing salts has delivered several key benefits to the Project, including:

    • A lower overall operating cost per tonne of salt harvested that justifies the higher upfront capital;

    • An increased overall recovery due to a portion of the Potassium-bearing brine entrained in waste salts in Ponds 2 and 3 being drained and pumped back into the pond system; and

    • A decreased overall pond size due to Ponds 2, 3 and 4 not being taken off-line and dried prior to harvesting.
    Last edited by ddzx: 07/05/18
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
7.1¢
Change
0.000(0.00%)
Mkt cap ! $27.10M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 30522 7.1¢
 

Sellers (Offers)

Price($) Vol. No.
7.9¢ 4040 1
View Market Depth
Last trade - 16.12pm 18/06/2025 (20 minute delay) ?
AMN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.