VRC 0.00% 0.4¢ volt resources limited

That is 1260 trucks @ 50 ton a truck = 6300 thousand ton a week...

  1. 110 Posts.
    lightbulb Created with Sketch. 97
    That is 1260 trucks @ 50 ton a truck = 6300 thousand ton a week at 8 mins not bad for a mine start up. Remember they are only using small 50 ton articulated dump trucks at the start to help with site preparations, tailing dams and waist. I am sure they will ramp up the size of trucks once they get up and going. I work in construction and mining industry for 20 years.
 
watchlist Created with Sketch. Add VRC (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $16.63M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
5 1910396 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 14402206 14
View Market Depth
Last trade - 07.00am 04/09/2024 (20 minute delay) ?
VRC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.