Your conclusion is faulted to say the least. Whats 3,800,000 tonnes of ore divided by 365 days ( yes, thats the amount stated in the PFS ). It is approximately 10,000+ a day. Additionaly, you assume one truck but the PFS does not. The PFS is aiming for a schedule that could deliver 17000 tonnes a day - and given these guys do this stuff for a living, you will forgive me for not taking your comments seriously, and instead relying on a group of professionals to know what is or isnt possible, and of course how to achieve objectives. In fact, the PFS does state that a fleet of 50 tonne trucks might better serve the overall project better as it would have additional flexibility. Talk about trying to force fit nonsense into the equation. Can only assume this is your first rodeo and you dont understamd that falling off the horse takes you out of the competition. Perhaps you could head over to MNS and fling this at them, they are going to take more out of the ground. Though, dont be suprised if they too tell you to go back and rethink your position.
- Forums
- ASX - By Stock
- VRC
- Ann: Pre-Feasibility Study Completed
Ann: Pre-Feasibility Study Completed, page-86
-
-
- There are more pages in this discussion • 167 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VRC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.63M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
39 | 70079358 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 8328211 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
39 | 70079358 | 0.003 |
17 | 23916715 | 0.002 |
8 | 18150001 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 8328211 | 12 |
0.005 | 18501965 | 16 |
0.006 | 9143468 | 15 |
0.007 | 10780001 | 5 |
0.008 | 4864155 | 6 |
Last trade - 16.12pm 09/10/2024 (20 minute delay) ? |
Featured News
LU7
The Breakdown: Lithium Universe talks refinery design and lithium processing in strong preliminary feasibility study for Bécancour
RCE
Phase II clinical trial recruitment for R327G topical gel passes halfway, showing promising results against bacterial skin infections
VRC (ASX) Chart |
Day chart unavailable
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online