Much more upsides to this than the PFS shows.
Production assumption of a reserved 2.2mtpa overall.
Stage 1 production rate Kolosori 2mtpa per ramp possibly 3 ramps
San Jorge stage 1 production rate 2mtps per ramp possibly multipule.
This could easily be ramped up over the next 3-4 years with more definition drilling at 4mtpa for each lease totalling 8mt due to the uniqueness of the deep water access, multiple vessel anchorage and multiple haulage circuitry.