The transportation is a real worry, Brent.
The following obstacles will need to be overcome:
1. Getting through the crime-riddled western Sydney suburbs
2. Not losing the plant in a two-up game at Broken Hill
3. Avoiding its abduction by steel plant workers in Whyalla
4. Evading Hell's Angels gangs across the Nullarbor
5. Explaining to the citizens of Perth that it's not a kid's climbing frame
Even if it makes it to Perth, rumour has it that the residents have trouble assembling an IKEA chair, let alone a PPP.
Billy has put his buying on hold.
- Forums
- ASX - By Stock
- Ann: Pre-Pilot Plant Milestone and Technical Strategy Update
The transportation is a real worry, Brent. The following...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
41.5¢ |
Change
0.015(3.75%) |
Mkt cap ! $95.49M |
Open | High | Low | Value | Volume |
41.0¢ | 42.0¢ | 39.5¢ | $138.7K | 337.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 25000 | 41.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
41.5¢ | 1148 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 25000 | 0.410 |
1 | 5000 | 0.405 |
3 | 32580 | 0.400 |
2 | 10645 | 0.395 |
3 | 19300 | 0.390 |
Price($) | Vol. | No. |
---|---|---|
0.415 | 1148 | 1 |
0.420 | 101115 | 4 |
0.425 | 16360 | 3 |
0.430 | 50000 | 1 |
0.445 | 5000 | 1 |
Last trade - 16.10pm 15/10/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online