For US EXIM to offer the entire Capex ($1 billion AUD) funding speaks VOLUMES imo and shows that the US side is very keen to get into Greenland. I think this point has been understated.
Now hopefully MIchael and board and bring home the bacon and finalise the entire process in Q1 2022 ...to end of March we could hopefully get the formal loan offer !
Q2 2022 June could see start of construction , that would be some milestone after 14 years.
- Forums
- ASX - By Stock
- Ann: Preliminary Approval for up to US$657m in Funding from EXIM
For US EXIM to offer the entire Capex ($1 billion AUD) funding...
-
- There are more pages in this discussion • 242 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IBG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
-0.001(12.5%) |
Mkt cap ! $5.924M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $10.50K | 3.001M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
21 | 23725748 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 7397597 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
20 | 23059082 | 0.003 |
19 | 13955034 | 0.002 |
6 | 8299989 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 7397597 | 6 |
0.005 | 4300330 | 8 |
0.006 | 4860777 | 2 |
0.007 | 815300 | 4 |
0.008 | 606448 | 3 |
Last trade - 15.55pm 12/07/2024 (20 minute delay) ? |
Featured News
IBG (ASX) Chart |