That is true peak..
But those costings were done before the feed study, and before the feed was to be released (that was going to cause a re-rate, according to Andrew). Then they didn’t release the feed.. instead did a new feed on a larger plant.
Does this mean that the numbers weren’t as good as originally thought?? And possibly bad enough to change direction toward a bigger plant.
Again, just like with all of this stuff. No one knows, as they won’t release the numbers and no one can try and speculate on potential income, they still haven’t released MIN’s royalty figure. Which means only 1 thing. That everything is STILL theoretical to investors.
- Forums
- ASX - By Stock
- Ann: Preliminary Conceptual Modelling & Economic Analysis
That is true peak.. But those costings were done before the feed...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
34.5¢ |
Change
-0.010(2.82%) |
Mkt cap ! $79.38M |
Open | High | Low | Value | Volume |
35.5¢ | 36.0¢ | 33.5¢ | $46.74K | 133.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 23212 | 34.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.0¢ | 42 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 23212 | 0.345 |
1 | 1500 | 0.335 |
6 | 28180 | 0.330 |
2 | 9000 | 0.325 |
4 | 10633 | 0.320 |
Price($) | Vol. | No. |
---|---|---|
0.350 | 42 | 2 |
0.360 | 11793 | 2 |
0.375 | 13545 | 3 |
0.380 | 40118 | 4 |
0.390 | 5000 | 1 |
Last trade - 15.28pm 07/11/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |