EXT excite technology services ltd

re: Ann: Preliminary Cost Estimates - Rossing... Hi AllI was...

  1. 2,318 Posts.
    lightbulb Created with Sketch. 1158
    re: Ann: Preliminary Cost Estimates - Rossing... Hi All

    I was expecting a production cost closer to US$20/lb.

    However on closer inspection of the report I see under section 7. Capital Cost Estimate "Mining costs have been omitted from the capital cost estimate, as a total mining cost of US$2.10 per tonne has been defined which includes capital and material movement during the course of mining.."

    In section 8. Operating Cost Estimate, the Annual Operating Cost table has Mining Cost (includes capital). I assume the amount of US$12.6/t* of ore, includes the above amount of US$2.10 per tonne.

    Excluding these capital cost, this would equate to a production cost of approximately US$21.5/lb (as the production cost per tonne is almost the same a the production cost per lb).

    These are after all only preliminary costings and hence are as usual with EXT's announcements on the Conservative side.

    Regards

    Steve
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.0¢
Change
0.001(11.1%)
Mkt cap ! $20.72M
Open High Low Value Volume
0.9¢ 1.0¢ 0.8¢ $31.15K 3.390M

Buyers (Bids)

No. Vol. Price($)
2 1600000 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 1109800 3
View Market Depth
Last trade - 15.23pm 27/06/2025 (20 minute delay) ?
EXT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.