So in the short history of Envirostream (battery recycling), we've had
- The original facility went up in flames
- The second facility (current), operated without an EPA license for 3-4 years
- The third facility (New Gisborne), operated with an EPA license, and was subsequently told by the EPA to relocate because they were within violation of EPA regulations
- The fourth facility has been closed due to cost cutting.
hmmmmmmm
- Forums
- ASX - By Stock
- Ann: Preliminary Final Report - Appendix 4E
So in the short history of Envirostream (battery recycling),...
- There are more pages in this discussion • 45 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LIT (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
-0.001(1.92%) |
Mkt cap ! $31.16M |
Open | High | Low | Value | Volume |
2.6¢ | 2.6¢ | 2.5¢ | $7.126K | 279.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
27 | 1686183 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 1951685 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
27 | 1686183 | 0.025 |
15 | 1241407 | 0.024 |
4 | 488477 | 0.023 |
4 | 340300 | 0.022 |
3 | 177666 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 1201685 | 9 |
0.027 | 1048192 | 10 |
0.028 | 1048091 | 13 |
0.029 | 1033519 | 11 |
0.030 | 1618122 | 11 |
Last trade - 15.36pm 11/06/2024 (20 minute delay) ? |
|
|||||
Last
2.5¢ |
  |
Change
-0.001 ( 3.85 %) |
|||
Open | High | Low | Volume | ||
2.6¢ | 2.6¢ | 2.5¢ | 725936 | ||
Last updated 13.33pm 11/06/2024 ? |
Featured News
LIT (ASX) Chart |