AKP 0.00% $6.20 audio pixels holdings limited

Ann: Preliminary Final Report, page-2

  1. 2,558 Posts.
    lightbulb Created with Sketch. 75
    So "Initial evaluation results of the lead wafer batch received showed that specific electro-mechanical characteristics of the devices differed from the design specifications"

    the fab stuffed up, but it takes 5 months for them to fix their stuff up!! Madness. Why would they not fix the mistake ASAP?
 
watchlist Created with Sketch. Add AKP (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.