They might raise case for future production plants.
However, for time being Earth Mountain will start production soon and there is no talk about paying Earth Mountain before production start. Anyway the major expense is factory and production line which is already done. Raw material cost per batch will not be much and Earth Mountain should be able to handle that.
I believe that short term cash need will not be much more than last few quarters and will be sufficiently met if another 2-4 Million loan is given to AKP.
- Forums
- ASX - By Stock
- Ann: Preliminary Final Report
They might raise case for future production plants.However, for...
-
- There are more pages in this discussion • 88 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AKP (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.20 |
Change
0.000(0.00%) |
Mkt cap ! $181.1M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AKP (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online