The problem is most of this planned industry hasn't turned up yet...I'm saying it won't.
I have friends in engineering houses both here and in Jakarta doing FEED studies on a lot of it so there is interest.
but it's not exactly leaping off the engineers table into full design then execution .... Why I'm told by my mates is it appears they suffer the same problems we have.
there are many case where foreign investors have lost they share of the asset to the local shyster .... I've stated in previous posts it's a nation of thieves.
- Forums
- ASX - By Stock
- Ann: Preliminary Final Report
The problem is most of this planned industry hasn't turned...
-
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
-0.001(10.0%) |
Mkt cap ! $27.71M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 0.9¢ | $24.64K | 2.365M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1859285 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 288000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1859285 | 0.009 |
6 | 981222 | 0.008 |
2 | 890600 | 0.007 |
2 | 2250000 | 0.006 |
2 | 500000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 288000 | 1 |
0.015 | 181052 | 2 |
0.016 | 725000 | 2 |
0.020 | 50000 | 1 |
0.025 | 10000 | 1 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
EWC (ASX) Chart |