AUZ 0.00% 1.0¢ australian mines limited

Ann: Preliminary findings indicate additional mineralisation, page-3

  1. 1,721 Posts.
    lightbulb Created with Sketch. 161
    Australian Mines Limited (“Australian Mines” or “the Company”) (Australia ASX: AUZ; USA OTCQB: AMSLF; Frankfurt Stock Exchange: MJH) advises that a review of the sterilisation drilling1 completed across the proposed processing infrastructure sites at Sconi, as part of the Company’s Bankable Feasibility Study (BFS), has indicated that high grade cobalt and nickel mineralisation2 extends across the sites proposed for the processing plant and haul roads. The sterilisation drilling, undertaken by Metallica Minerals Limited in the lead-up to the project’s Pre-Feasibility Study3 (PFS), identified a preferred site for the processing plant at Sconi. This location appears primarily designed to optimise scandium production from the ore body and did not comprehensively sterilise the cobalt and nickel prospectivity of the proposed mining and processing area. Since acquiring a 100%-interest in the Sconi Project from Metallica Minerals in 2017, and having signed a binding off-take agreement with SK Innovation1 , Australian Mines has been focused on optimising the Sconi BFS for cobalt and nickel production to maximise economic returns from the Project4

    This finding by Australian Mines’ Studies Team that the previous sterilisation drilling intersected similar grades to those included in the project’s current Mineral Resource5 indicates that the overall footprint of cobalt and nickel mineralisation at the Company’s 100%- owned Sconi Project may be significantly larger than previously indicated by both the PreFeasibility Study6 (PFS) for Sconi and the project’s existing Mineral Resource Statement. As a result, Australian Mines, in collaboration with lead engineering firm Ausenco7 , are presently re-evaluating the location and layout of the full-scale cobalt-nickel-scandium processing plant, and associated non-processing infrastructure to ensure the final site design enables maximum operational efficiency (and, thus, the lowest possible operating costs for the project) in tandem with optimising the Sconi Project’s Life-of-Mine. The current optimisation process for the Sconi BFS, which is appropriate in light of the additional cobalt and nickel mineralisation within sites earmarked for the processing plant and supporting infrastructure8 , will necessarily result in a slight adjustment to the proposed BFS timetable. The Company now expects to receive the draft version of the report by the end of July 2018, with the final Board-approved version subsequently released to the market in September 2018. This adjusted timing of the BFS is not expected to have any effect on the construction date for the project given that both SK and the financial institutions engaged in negotiations with Australian Mines are imbedded in the Company’s current BFS process. Australian Mines’ Managing Director, Benjamin Bell, commented: “Australian Mines remains committed to delivering the maximum value to shareholders from the Sconi Project through the delivery of a large-scale cobalt-nickel-scandium mining and processing operation in northern Queensland. “Given this operation has the potential to run for several decades once commissioned it is imperative that we invest time at this critical planning stage to ensure the site is set-up to maximise and sustain future production. “The positive news for Australian Mines’ shareholders from the review of the sterilisation drilling program, is that the grades intersected were sufficient for us to reassess the plant location and will inevitably be the catalyst for us to reassess the overall footprint of the cobalt and nickel mineralisation.

    “The results from sterilisation drilling at Sconi, along with the anticipated results from the upcoming resource expansion drill program will provide significant data for us to revisit the existing Mineral Resource estimate and assess potential future conversion of those resources to Ore Reserves.”
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.000(0.00%)
Mkt cap ! $13.98M
Open High Low Value Volume
1.0¢ 1.0¢ 0.9¢ $80.55K 8.055M

Buyers (Bids)

No. Vol. Price($)
1 35100 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 5627269 18
View Market Depth
Last trade - 15.26pm 06/05/2024 (20 minute delay) ?
Last
1.0¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
0.9¢ 1.0¢ 0.9¢ 9546693
Last updated 15.58pm 06/05/2024 ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.