FFX 0.00% 20.0¢ firefinch limited

Ann: Preliminary Haul Route Defined at Ntiola , page-320

  1. 4,528 Posts.
    lightbulb Created with Sketch. 4
    Drilling Ann was out 8 days ago.. Mali is 11hrs est.. 1000mtr wouldn't take long to drill... Probably cataloging and packing would take just as long???

    Analysing another week n half ...?? I would guess results just before Xmas as a present to the believers!!

    Watch mister CSX to drop price after lunch to 14s with B $hit volume!!
 
watchlist Created with Sketch. Add FFX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.