Read this a few times now and think I understand.. The company is trying to establish the initial grades from the 2017 samples in order to compare grades with current samples. Seems like it's on track to achieve the same result. Something at this stage is better than nothing though not sure why they needed a TH.
- Forums
- ASX - By Stock
- GCM
- Ann: PRELIMINARY METALLURGICAL TEST WORK MCINTOSH PROJECT
Ann: PRELIMINARY METALLURGICAL TEST WORK MCINTOSH PROJECT, page-3
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
Add GCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.937M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $20 | 9.814K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 20527061 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 5537258 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 20527061 | 0.002 |
24 | 31850613 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 5537258 | 7 |
0.004 | 19623731 | 11 |
0.005 | 9547981 | 7 |
0.006 | 853499 | 8 |
0.007 | 273098 | 2 |
Last trade - 10.04am 04/10/2024 (20 minute delay) ? |
Featured News
GCM (ASX) Chart |