If the metallurgy works not out (the last notice had been very bad) the whole graphite project will be dead. In that case the recent market cap for this stock is in my eyes still ways too high...... Normally they should test the metallurgy independly before they acquire and promote such a project......
- Forums
- ASX - By Stock
- GCM
- Ann: PRELIMINARY METALLURGICAL TEST WORK MCINTOSH PROJECT
Ann: PRELIMINARY METALLURGICAL TEST WORK MCINTOSH PROJECT, page-51
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add GCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.937M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $20 | 9.814K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 20527061 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 5537258 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 20527061 | 0.002 |
24 | 31850613 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 5537258 | 7 |
0.004 | 19623731 | 11 |
0.005 | 9547981 | 7 |
0.006 | 853499 | 8 |
0.007 | 273098 | 2 |
Last trade - 10.04am 04/10/2024 (20 minute delay) ? |
Featured News
GCM (ASX) Chart |