MAY 3.13% 3.3¢ melbana energy limited

Ann: Preparations underway for start of Zapato-1 exploration well, page-440

  1. 441 Posts.
    lightbulb Created with Sketch. 346
    Drilling strata again end may. Results or updates have taken up to two weeks from drilling start last few times. The game should be back on as start of June!

    gltah
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.