MAY 3.13% 3.3¢ melbana energy limited

Ann: Preparations underway for start of Zapato-1 exploration well, page-46

  1. 2,040 Posts.
    lightbulb Created with Sketch. 174
    They said they'll go back to Almeda-1 after Zapato is drilled at END OF MAY!!
    That will give them time to get the right rig. They may need to order it, get it delivered etc...to plan it.
    So the timeline has blown out by 4-6 weeks, who cares? It's still a MEGA oil reservoir.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.