MAY 3.13% 3.3¢ melbana energy limited

Ann: Preparations underway for start of Zapato-1 exploration well, page-52

  1. 1,185 Posts.
    lightbulb Created with Sketch. 80
    i wouldnt waste time on a well that cant do the whole reservoir
    might as well start zap and redesigned alameda no biggy just the time frames shifted
    or am i missing something
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.