MPR 0.00% 1.4¢ mpower group limited

Ann: Presentation - Actioning the Build Own Operate Strategy, page-11

  1. 1,417 Posts.
    lightbulb Created with Sketch. 144
    OK hows this for some very, very rough estimations.

    ~$8M rev & ~$1.6M GM for build
    ~$0.2M rev & ~$0.1M GM per annum maintain
    Operating income - Depends on financing, but x% of $1.2M pa
    Looking at 4C and Annual Report, Id estimate fixed overheads at ~$4M pa, with the rest being project labour & product costs.

    Assume they can build 20 in the next 5 years.
    $1.6M x 20 = $32M build GM
    $0.1M x 20 = $2M pa maintain GM, assume even ramp = $5M over 5 years
    Assume they get 25% of ongoing revenue = $6M pa = $30M over 5 years
    Total GM = $67M
    Total Overheads = $5M x 5 = $25M
    Total EBITDA = $42M over 5 years
    NPAT ~$30M
    Plus $7.4M franking credits

    Current MC $13M

    Just not 100% sure on costs for them to get the ongoing revenue. Assuming it would be debt funded, so great while debt is cheap.

    But like most infrastructure plays, its the long term game that counts! Once you have 20 running, 20 sites give ~$8Mpa GM for the next 30 years.

    So yeah, cant see this being a $100M business anytime soon, but a bag each year from here might be entirely doable.... Especially if they can unleash those franking credits!

    Now obviously this is all very back of the envelope stuff, but anyone see any major holes or things Im missing?

 
watchlist Created with Sketch. Add MPR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.