Kwale siteworks started in Q2 2012 and produced their first finished products in Dec 2013. Assuming Toliara is a similar scale I see no reason to doubt their preliminary schedule. The only uncertainty in my mind is the quality of existing road access and the amount of work required before main construction can commence. But if this were an issue I’m sure they would do the necessary early works. They did an excellent job on the Kwale design and construction, and I see no reason why they won’t do the same on Toliara. Engineering colleagues of mine who worked for Ausenco on the Kwale design spoke highly of the Base team.
- Forums
- ASX - By Stock
- Ann: Presentation - Arlington Pre-daba
Kwale siteworks started in Q2 2012 and produced their first...
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BSE (ASX) to my watchlist
(20min delay)
|
|||||
Last
26.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $312.1M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 238 | 27.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
24.5¢ | 4763 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 4243 | 0.265 |
6 | 251894 | 0.260 |
5 | 312245 | 0.255 |
10 | 532195 | 0.250 |
3 | 149980 | 0.245 |
Price($) | Vol. | No. |
---|---|---|
0.245 | 4763 | 1 |
0.260 | 371 | 2 |
0.265 | 1040 | 1 |
0.270 | 85009 | 6 |
0.275 | 623503 | 8 |
Last trade - 09.44am 05/07/2024 (20 minute delay) ? |
Featured News
BSE (ASX) Chart |
Day chart unavailable