The average grade has dropped over 2% in the last 12 months as they finish the high grade central dune. They have also been commissioning KP2 and there will inevitably be some impact on operation costs. In this context a $4.9m OPEX increase for the year looks pretty good to me.
- Forums
- ASX - By Stock
- Ann: Presentation - FY18 Results
The average grade has dropped over 2% in the last 12 months as...
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)