BSE 3.77% 25.5¢ base resources limited

I’m assuming the 2020 H2 production start for Toliara is a typo....

  1. 205 Posts.
    lightbulb Created with Sketch. 27
    I’m assuming the 2020 H2 production start for Toliara is a typo. Should be 2021 based on their previous asx announcements.
    Base seem to have allowed plenty of time in their project schedule - one would think it could be done faster given the amount of work WTR had already done. Having said that, there are other factors at play (funding etc), and the extra time allows them to get the design right without the usual stuff-ups.
 
watchlist Created with Sketch. Add BSE (ASX) to my watchlist
(20min delay)
Last
25.5¢
Change
-0.010(3.77%)
Mkt cap ! $300.3M
Open High Low Value Volume
26.0¢ 26.5¢ 25.5¢ $101.1K 390.3K

Buyers (Bids)

No. Vol. Price($)
5 349371 25.5¢
 

Sellers (Offers)

Price($) Vol. No.
26.0¢ 360000 1
View Market Depth
Last trade - 16.10pm 25/07/2024 (20 minute delay) ?
BSE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.