I’m assuming the 2020 H2 production start for Toliara is a typo. Should be 2021 based on their previous asx announcements.
Base seem to have allowed plenty of time in their project schedule - one would think it could be done faster given the amount of work WTR had already done. Having said that, there are other factors at play (funding etc), and the extra time allows them to get the design right without the usual stuff-ups.
- Forums
- ASX - By Stock
- Ann: Presentation - FY18 Results
I’m assuming the 2020 H2 production start for Toliara is a typo....
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BSE (ASX) to my watchlist
|
|||||
Last
25.5¢ |
Change
-0.010(3.77%) |
Mkt cap ! $300.3M |
Open | High | Low | Value | Volume |
26.0¢ | 26.5¢ | 25.5¢ | $101.1K | 390.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 349371 | 25.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
26.0¢ | 360000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 274571 | 0.255 |
17 | 595167 | 0.250 |
3 | 63816 | 0.245 |
1 | 21906 | 0.240 |
1 | 20000 | 0.235 |
Price($) | Vol. | No. |
---|---|---|
0.260 | 360000 | 1 |
0.265 | 22838 | 2 |
0.270 | 86517 | 4 |
0.275 | 687702 | 13 |
0.280 | 1307528 | 19 |
Last trade - 16.10pm 25/07/2024 (20 minute delay) ? |
Featured News
BSE (ASX) Chart |