Goldbuggalo,
Bottletree on early indications may contain 500m tonnes of ore.
Bhp bought oz minerals for plus 9.6b with around 1.5b tonnes of ore across varies sites.
If Spq has 1/3 of the ore. 3.2B
Oz minerals has operating mines etc. So if we remove 1.2b build costs. We get 2b. If we remove 1b risk, we get 1b.
Then there is cockie creek, dido and big mag.
Not forgetting steam engine.
I'd be looking at 800m to 1b based on oz minerals as fair price for Spq based on what we know today.
300m to the 500m would be undervalue I feel on potential of the other assets, or bottletree being larger than 500m tonnes of ore.
- Forums
- ASX - By Stock
- Ann: Presentation - Noosa Mining and Investor Conference
Goldbuggalo,Bottletree on early indications may contain 500m...
-
- There are more pages in this discussion • 514 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SPQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.01M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.6¢ | $1.158K | 192.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 10982002 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 4714728 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 10982002 | 0.006 |
10 | 5823149 | 0.005 |
5 | 1389475 | 0.004 |
1 | 600000 | 0.003 |
1 | 800000 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 4714728 | 5 |
0.008 | 9205309 | 11 |
0.009 | 2786221 | 3 |
0.010 | 2238894 | 5 |
0.011 | 740000 | 2 |
Last trade - 11.00am 12/11/2024 (20 minute delay) ? |
Featured News
SPQ (ASX) Chart |
The Watchlist
3DA
AMAERO INTERNATIONAL LTD
Hank Holland, Executive Chairman and CEO
Hank Holland
Executive Chairman and CEO
Previous Video
Next Video
SPONSORED BY The Market Online