SVM sovereign metals limited

Ann: Presentation - Optimised PFS Outcomes, page-4

  1. 203 Posts.
    lightbulb Created with Sketch. 73
    From John Meyer senior analyst at SP Angel

    Sovereign Metals* (SVML LN) 38p, Mkt Cap £234m – Quarterly report highlights Rio Tinto oversight of optimised prefeasibility study(Sovereign currently holds 100% of the Kasiya project. Malawi has 10% free carry right. Rio Tinto acquired an initial strategic interest of 15% for A$40m mid 2023 and has recently invested a further A$19.2 to move up to 19.9%)STRONG BUY – Valuation 55p

    The recently published optimised PFS shows the Kasiya project to be the worlds largest and lowest-cost producer of natural rutile and natural flake graphite.The large-scale, yet relatively simple project appears to meet the criteria for major company involvement.Recently completed trials highlight that rutile and graphite can be simply mined from surface using conventional machinery for dry mining or hydraulically mined using high-pressure hoses.The main test pit has been refilled to its original ground level and on-site soil remediation and land rehabilitation is now underway.We expect trials to show improved crop yields after rehabilitation with the rutile and graphite removed.Rutile: Iluka recently reported firm prices for rutile at $1,662/t for Q4 for 95% gradeproduct.Graphite: test work confirmed the Kasiya graphite is suitable for sale a refractory material. Further work will likely confirm the graphite is also suitable for Li-ion battery anodes.Optimised PFS results:Capex: US$665mTotal life of mine development capital: US$1,127m vs US$1,250m in September 2023Sustaining capital: US$397mNPV8% US$2,322mIRR of 27%Operating costs: US$428/t vs US$404/t , on an FOB, Nacala basisThroughput: 12mtpa for Stage 1 rising to 24mtpa in Stage 2Production - Rutile: 222,000tpa- Graphite 233,000tpaSales US$640mpaEBITDA US$409mpaMine life 25 years initiallyAssumptions: Rutile: US$1,490/t (Iluka report rutile at $1,662/t today for Q4 for 95% grade rutile)Graphite: US$1,290/tQuarterly financials, Expenditure:Sovereign spent A$7.2m on drilling, assays, metallurgical test work, ESG and other Malawi operations through the past quarter. Staff costs came to a relatively modest A$369,000 for the quarter implying total staff costs of around A$1.5m for the year.Admin and corporate costs were A$326,000 for the quarter and A$970,000 for the six monthsInterest received was A$650,000 in the quarter covering almost all the staff, admin and corporate costsCash and cash equivalents stand at A$33.5m.Conclusion: It is refreshing to see a company where the interest received virtually covers all the staff, admin and corporate costs, with the vast majority of expenditure on the development of the value of the asset in the ground.Sovereign will upgrade the optimised PFS to a DFS in Q2 at which point we expect the company to enter into discussions over the mine financing and potential partners for the mine development.

    We suspect Rio Tinto may prefer to become the sole operator of the mine leading to the takeover of Sovereign Metals.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
71.0¢
Change
0.010(1.43%)
Mkt cap ! $459.3M
Open High Low Value Volume
70.0¢ 72.0¢ 69.5¢ $227.9K 323.6K

Buyers (Bids)

No. Vol. Price($)
7 7222 71.0¢
 

Sellers (Offers)

Price($) Vol. No.
72.0¢ 36944 3
View Market Depth
Last trade - 16.10pm 08/07/2025 (20 minute delay) ?
SVM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.