I notice they listed more results from Toweranna and Withnell.
What happened to results from hole 259 at Mallina?
The 400m dd holes at Toweranna have already commenced.
I assume these will be tails of the rc holes already done.
These will be the first dd holes other than that sample for Tomra and the metallurgy purpose hole or holes.
I think it would be safe to say that it will be mid to late June for assays of the dd holes but the rc to 200 and the step out will be a little quicker than that. Some of those rc holes already done should start to flow in over the next weeks.
Kind regards, Wack.
- Forums
- ASX - By Stock
- DEG
- Ann: Presentation - RIU Conference Sydney
Ann: Presentation - RIU Conference Sydney, page-3
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DEG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.37 |
Change
0.010(0.74%) |
Mkt cap ! $3.283B |
Open | High | Low | Value | Volume |
$1.34 | $1.40 | $1.33 | $10.11M | 7.349M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 102613 | $1.37 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.38 | 80705 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 102613 | 1.370 |
5 | 163059 | 1.365 |
3 | 77986 | 1.360 |
1 | 59080 | 1.355 |
4 | 31250 | 1.350 |
Price($) | Vol. | No. |
---|---|---|
1.380 | 80705 | 3 |
1.385 | 92560 | 4 |
1.390 | 58476 | 1 |
1.400 | 10900 | 2 |
1.405 | 10000 | 1 |
Last trade - 16.10pm 13/11/2024 (20 minute delay) ? |
Featured News
DEG (ASX) Chart |