SVG 0.00% 2.4¢ savannah goldfields limited

I guess if we build JORC to say 1.5m they would need a bigger...

  1. 1,224 Posts.
    lightbulb Created with Sketch. 416
    I guess if we build JORC to say 1.5m they would need a bigger plant than for the present JORC.

    Would be good if it could be easily scaled up by modular design.
    But must not be that easy or we would have or be about to have the smaller version now.
    I am sure Scott Hall would be across what is out there to handle our requirements.

    Assuming it can't be modulised then it would make sense to hold off for a bit whilst drilling these other prospective areas through 2021.
    By late 2021 or early 2022 we should have a better idea of what we actually have in the ground and as to what is needed in the way of plant .


 
watchlist Created with Sketch. Add SVG (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.000(0.00%)
Mkt cap ! $6.746M
Open High Low Value Volume
2.4¢ 2.4¢ 2.4¢ $320 13.33K

Buyers (Bids)

No. Vol. Price($)
1 29970 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.7¢ 20621 1
View Market Depth
Last trade - 10.08am 30/08/2024 (20 minute delay) ?
SVG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.