that will come to approx $80/ton of ore. That means $80/Ton x 18000 T= $1,440,000. Got exactly same as Shellbell calculation.
$80/ton x 43,000 Ton= $3,440,000
The cost of a processing plant is spent on transport.
- Forums
- ASX - By Stock
- SVG
- Ann: Presentation to AGM
Ann: Presentation to AGM, page-68
-
-
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add SVG (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.183M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
SVG (ASX) Chart |
Day chart unavailable