eg:
18 RAB holes at Mongalata (1440m): $28,800
18 RAB holes at Black Hill (1440m): $28,800
18 Diamond holes (1220m), 18 RC holes (1450m), 23 RAB holes (1520m) at princess Royal: $332,400
2 400m Diamond holes at Burra North: $80,000
41 RAB holes (4760m) at Saplding: $95,200.
Total: $565,200.
- Forums
- ASX - By Stock
- PNX
- Ann: Presentation to Mining SA conference
Ann: Presentation to Mining SA conference , page-10
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PNX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online