Well, that basically covers most of what we have been discussing here.
The PFS in it's current form is obsolete.
Re-start drilling so a larger resource can be used in either the revised PFS or DFS.
I'd still like to see two scenarios in the next document. 2-3mtpa pure spodumene mining v secondary processing.
To anyone with processing knowledge, is the flotation step the cause of the full $34p/t increase in processing costs? What benefits does this process give, is it responsible for the recovery uplift from 75% to 80%? Seems strange this would just be left out of the SS if it was required.
Cheers!
BGS Price at posting:
29.5¢ Sentiment: Hold Disclosure: Held