They can only do the trials at present in the 10 tpd as they don’t have a 50 t plant yet.
Crux interview it was mentioned that modification to front end was the secret to getting higher rates.
once these modifications were done and proved successful as per the announcement re new recovery rates perhaps because lithium still pending they announce separately once those results in.
Better to under promise and then over achieve?
Any changes to the 10 tpd plant to get better results won’t be getting left out of the 50 tpd plants that would be a certainty.
- Forums
- ASX - By Stock
- Ann: Primobius - 50tpd Hub Engineering Cost Study Results
They can only do the trials at present in the 10 tpd as they...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NMT (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
-0.005(4.76%) |
Mkt cap ! $62.28M |
Open | High | Low | Value | Volume |
10.0¢ | 10.5¢ | 9.9¢ | $219.6K | 2.187M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 89257 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 664762 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 89257 | 0.100 |
8 | 651648 | 0.099 |
3 | 51536 | 0.098 |
1 | 10000 | 0.097 |
3 | 13016 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 664762 | 11 |
0.110 | 530785 | 8 |
0.115 | 358559 | 7 |
0.120 | 121750 | 5 |
0.125 | 90000 | 2 |
Last trade - 16.10pm 15/05/2024 (20 minute delay) ? |
|
|||||
Last
10.0¢ |
  |
Change
-0.005 ( 0.40 %) |
|||
Open | High | Low | Volume | ||
10.3¢ | 10.5¢ | 10.0¢ | 777385 | ||
Last updated 15.59pm 15/05/2024 ? |
Featured News
NMT (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online