If you read the ann you will realise the higher rate is only achieved on 10tpd for 8 trials.
This discussion is ECS re: 50tpd capacity.
Anyway do you know why they use the lower rate for ECS?
- Forums
- ASX - By Stock
- Ann: Primobius - 50tpd Hub Engineering Cost Study Results
If you read the ann you will realise the higher rate is only...
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NMT (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $71.62M |
Open | High | Low | Value | Volume |
11.0¢ | 12.5¢ | 11.0¢ | $18.24K | 156.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 46118 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 47545 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 46818 | 0.115 |
9 | 312445 | 0.110 |
28 | 417695 | 0.105 |
25 | 937370 | 0.100 |
11 | 719503 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 47545 | 7 |
0.125 | 361408 | 5 |
0.130 | 160040 | 7 |
0.135 | 349062 | 10 |
0.140 | 303300 | 5 |
Last trade - 15.50pm 04/06/2024 (20 minute delay) ? |
|
|||||
Last
11.0¢ |
  |
Change
0.000 ( 5.42 %) |
|||
Open | High | Low | Volume | ||
11.5¢ | 12.0¢ | 11.0¢ | 51045 | ||
Last updated 15.59pm 04/06/2024 ? |
Featured News
NMT (ASX) Chart |