re: Ann: Processing Plant Design Finalised fo... My mate just got back to me. I asked about the 3-4 months.
"man by the looks of it it is quite a large job with loads of control wiring, I would be surprised it could be done in 3 to 4 months in total, let alone but **** Africa?
You can do with that as you will.
- Forums
- ASX - By Stock
- KAB
- Ann: Processing Plant Design Finalised for Emmanu
Ann: Processing Plant Design Finalised for Emmanu, page-65
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAB (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online