Not wanting to rain on anyones parade, but BC8 is taking a very different route to most miners....
they want a minimum of 3 years of mine life (most projects look for a minimum of 5).
The plant is going to be quite small, so, efficiency of scale will not be in their favor...
Capital costs, while small at $40m, will still take perhaps 2 years to pay off...
Of course, if the POG flies higher, then sure, its worth the risk.
I do feel the company will have to raise 100% of the capital, which is fine in some ways, but... highly dilutive.
I will watch on and see how this goes... (just looks a little like what KIN planned... and sadly that did not go well).
Good luck to all holders.
- Forums
- ASX - By Stock
- Ann: Processing Plant Update
Not wanting to rain on anyones parade, but BC8 is taking a very...
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BC8 (ASX) to my watchlist
(20min delay)
|
|||||
Last
40.0¢ |
Change
0.030(8.11%) |
Mkt cap ! $177.2M |
Open | High | Low | Value | Volume |
38.5¢ | 40.5¢ | 37.5¢ | $2.257M | 5.779M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 8000 | 38.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
40.0¢ | 14869 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 8000 | 0.385 |
2 | 200000 | 0.380 |
4 | 420847 | 0.375 |
6 | 215000 | 0.370 |
1 | 13698 | 0.365 |
Price($) | Vol. | No. |
---|---|---|
0.400 | 14869 | 1 |
0.405 | 200000 | 2 |
0.410 | 382363 | 9 |
0.415 | 20000 | 1 |
0.420 | 117157 | 3 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
BC8 (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online