CE1 0.00% 0.9¢ calima energy limited

Ann: Production above 4,500 boed & Q1 2022 program commenced, page-17

  1. 1,579 Posts.
    lightbulb Created with Sketch. 300
    for those that havent seen the montney permit...

    ce1 have a BC OGC permit that expires in March 2023 to snub in to the old well and pipe to a flare...

    shouldnt take long to snub in and as flaring regs are tight

    100108146 Calima Energy Inc. OGAA Associated Oil and Gas Activity: Deck Site, Workspace Changes In and About a Stream # 0005231
    Pipeline Project # 000025251
    Last edited by retorn123: 11/01/23
 
watchlist Created with Sketch. Add CE1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.