the early well tests were disrupted by coil clean out operations, and run for a short period of time, so that they were still both flowing plenty of frac fluid, as jordan mentioned in the qrtrly
they expect flow rates now the well has rested, and frac fluid dispersed, to be higher
A number of Montney operators have observed substantial
improvements both in total production rates and CGRs by allowing wells to sit for a period of time
(typically 6-9 months) prior to being brought on production. This is commonly referred to as “soak
time”
(2)
- Forums
- ASX - By Stock
- CE1
- Ann: Production above 4,500 boed & Q1 2022 program commenced
Ann: Production above 4,500 boed & Q1 2022 program commenced, page-24
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CE1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.571M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CE1 (ASX) Chart |
Day chart unavailable