CE1 0.00% 0.8¢ calima energy limited

the early well tests were disrupted by coil clean out...

  1. 1,577 Posts.
    lightbulb Created with Sketch. 298
    the early well tests were disrupted by coil clean out operations, and run for a short period of time, so that they were still both flowing plenty of frac fluid, as jordan mentioned in the qrtrly

    they expect flow rates now the well has rested, and frac fluid dispersed, to be higher

    A number of Montney operators have observed substantial
    improvements both in total production rates and CGRs by allowing wells to sit for a period of time
    (typically 6-9 months) prior to being brought on production. This is commonly referred to as “soak
    time”
    (2)
 
watchlist Created with Sketch. Add CE1 (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.000(0.00%)
Mkt cap ! $5.067M
Open High Low Value Volume
0.8¢ 0.9¢ 0.8¢ $54.47K 6.440M

Buyers (Bids)

No. Vol. Price($)
9 14015506 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 2562946 3
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
CE1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.