since that time, saguaro, tourmaline and others have improved completions, leading to higher early flow and eur
so new completions can get ip30 around 12 mmcf/d
but they have also found cheaper completion methods to keep the same eur, with lower early flow
and thats the way they are now going with around 6 mmcf/d ip30..with better economics
so ip30 isnt really a great way to compare potential...
- Forums
- ASX - By Stock
- CE1
- Ann: Production above 4,500 boed & Q1 2022 program commenced
Ann: Production above 4,500 boed & Q1 2022 program commenced, page-25
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CE1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.700M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CE1 (ASX) Chart |
Day chart unavailable