CE1 0.00% 0.9¢ calima energy limited

Ann: Production above 4,500 boed & Q1 2022 program commenced, page-26

  1. 1,579 Posts.
    lightbulb Created with Sketch. 300
    from the quaterly...

    The Mid‐Montney well (Calima 2) had a
    successful test with a maximum rate of 10.2 MMscf/d but still had 84% of the load fluid left to recover. The Upper
    Montney (Calima 3) well test had to be cut short due to deteriorating ground conditions with the well recovering only
    5% of the load fluid. A planned retest of these wells in Q1 2023 will likely yield improved gas and condensate rates
    compared to the original tests based on well test results from offset operators who intentionally shut in the wells for
    the load fluid to dissipate into the formation prior to flowback.
 
watchlist Created with Sketch. Add CE1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.