With maximum throughput, last March and June quarter they achieved production of 16,000 oz per quarter with a low grade of .8g/t, surely now with the deeper pit higher grade ore and mixed with the JV ore they should be getting over 1g/t which should then be around the 20,000ozs per quarter. Maybe they are being conservative, we will wait and see what the coming March quarter production is.
- Forums
- ASX - By Stock
- Ann: Production and cashflow guidance increases
With maximum throughput, last March and June quarter they...
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable