Interesting to compare this latest Production Profile graphic from the earlier one provided in the Ore Reserve Statement of last September.
FY25, FY29 & FY30 appear essentially unchanged. FY28 is slightly reduced (approx. 3k oz). The big changes in the plan occur in FY26 (approx. 8K oz less) and FY27 (approx. 35k oz more).
We should not forget that these graphics do not include Blue Bar (Haoma JV), which will already contribute to FY24. Although the Sep graphic makes mention of Haoma JV production, neither graphic includes any figures for this. However, statements from management make it clear that combined production in the ballpark of 100k oz per annum is expected.
All IMO.
- Forums
- ASX - By Stock
- Ann: Production and cashflow guidance increases
Interesting to compare this latest Production Profile graphic...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online