This operation has had so many red flags
they are now all flapping in the breeze
they never did any trials and the flotation they went with came from MOP existing technologies
The Kilne is also a problem I have been told
Fastrack to no were Cap Raise Tony
has a bit of egg on his face and has cost his SHs
he should resign before he is pushed
- Forums
- ASX - By Stock
- SO4
- Ann: Production and Commissioning Update
Ann: Production and Commissioning Update, page-26
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)